Bolu Göynük Thermal Power Plant completely fulfills the requirements of the Covid-19 Hygiene, Infection Prevention and Control Guide published by the Ministry of Industry and Technology of the Republic of Turkey for industrial facilities. The plant was granted the Covid-19 Safe Production Certificate, issued by TSE in October 2020.
As Aksa Energy, we say health first in energy production and we do not compromise on safe energy production!