In accordance with capacity increase works of Sebenoba Wind Park located in Samandağ district of Hatay, wind turbines with a total of 9 MW installed power have been accepted by the Ministry of Energy and Natural Resources and commissioned on May, 2015.
Therefore, the total installed power of Hatay Sebenoba Wind Park is increased to 60 MW and the capacity increase has been completed.
Thus, total WEPP capacity of Aksa Energy increased to 259 MW. Therefore, Aksa Energy has the 4th largest WEPP in Turkey.